Delhi Metro: Phase 4 of the metro will have new trains with a tricolor theme, with six-coach trains being manufactured indigenously
Delhi Metro: The new driverless trains of Delhi Metro's Phase 4 will feature the national flag as a theme. These six-coach trains, fully manufactured in India, aim to inspire nationalism. The interiors of each train will be decorated in three colors:
Breaking News, Digital Desk- (Delhi Metro) The new driverless trains of Delhi Metro's Phase 4 will feature the theme of the national flag. These six-coach trains, fully manufactured in India, aim to inspire nationalism. The interiors of each train will be decorated in three colors.
Goods are cheaper in NCR than in Delhi, people come from far and wide to buy them.
The first and fourth coaches will be saffron, the second and fifth coaches will be white, and the third and sixth coaches will be green. This color scheme will give the entire train a distinctive national look.
So far, one Phase IV metro train has arrived in Delhi. Trials are underway at the Mukundpur depot. This train could soon be running on the metro corridor.
These trains will differ from the older trains in several ways. They will be able to accelerate at higher speeds than the older metro trains. They will also be less noisy during operation.
This will reduce noise pollution. Furthermore, unlike the existing automated metro trains in Phase 3, the coach seats of the new Metro trains in Phase 4 will not be colorful. All coaches will have mobile and laptop charging facilities for passengers.
These corridors are being built under Phase-Four-
In Phase 4, Janakpuri West-RK Ashram Corridor, Maujpur-Majlis Park Corridor and Golden Line (Tughlakabad-Aerocity) Corridor are being constructed.
The Maujpur-Majilas Park Corridor is complete. This is an extension of the Pink Line. Finishing work is underway at five stations along this corridor.
Metro trials have also been completed on this corridor between Majlis Park and Jagatpur Village. Metro operations are awaited.
Metro will start running on this corridor soon
Metro operations may soon begin on this corridor, and new metro trains may also be introduced. The Janakpuri West-RK Ashram corridor is an extension of the existing Magenta Line.
Metro services have already begun on this corridor between Janakpuri West and Krishna Park Extension. The structure of the elevated corridor from Deepali Chowk to Majlis Park has also been completed.
According to DMRC, 24 new trains (144 new coaches) will be used on the Magenta Line corridor, 15 trains (90 new coaches) on the Pink Line corridor and 13 trains (78 new coaches) on the Golden Line.
These trains will promote the Make in India initiative. These trains will have a maximum speed of 95 kilometers per hour and can operate at speeds of up to 85 kilometers per hour. The maximum speed of the Phase III automated metro trains is 80 kilometers per hour.
Other features of the new Phase 4 trains will be:
- High resolution CCTV cameras will be used.
- HVAC (heating, ventilation, air conditioning) systems are designed for maximum passenger comfort. Energy consumption will be minimal.
- All propulsion equipment in the train is designed and manufactured in the country.
- All materials used in the coach have been carefully selected to reduce the carbon footprint.
- More display units have been installed for the convenience of passengers.